Reconstruction of Cableway to Snezka
Investor
Municipality Pec pod Sněžkou
Locality
Hradec Králové Region
Construction terms
09/2011 - 03/2014
09/2011 - 03/2014
Together with LEITNER ropeways BAK is implementing a 4-person cableway on the 1,602 metre mountain that will be accessible by 2014. The new cable way - anticipated to start operating in March 2014 - will depart from Pec pod Sněžkou to the Sněžka in two sections. Travelling at a speed of 5 m/sec, the gondolas will reach the mountain station on the peak in just over twelve minutes. The new system will be built as a replica: the supports will be modelled on their 50-year-old predecessors and constructed on precisely the same alignment.